ONE, TWO… WE’LL MAKE IT EASY FOR YOU!

Phase One

  • On Site Consultation with Project Manager to determine your needs.
  • We’ll provide you with options for your project.
  • You Accept the Quote by Signing and providing the Deposit.
  • You sign the Permit Forms, and we plan the scope of work.
  • You call City Gas to request a meter if you don’t have one.
  • Plans are drawn up by our team of licensed experts.
  • We submit the documents to the City and wait for their review to permit.
  • Permits, when ready are picked up and we Schedule a start date.
  • Permits are placed on site and the work begins.

Natural Gas Meter Suppliers

Phase Two

  • Work begins by Trenching (if going underground).
  • Poly pipe is laid in the Trench or Galvanized piping is attached to the wall.
  • Valves, Regulators, are Installed as necessary in your project.
  • Rough Inspection is called in and Pressure Test is performed.
  • The Trench is covered after rough inspection is passed.
  • All final connections are made.
  • Final Inspection is called to complete the project.

… SO SIMPLE, AND YOU’VE GOT GAS!

Supplier vs. Customer Responsibility
Gas Line Incoming to Riser Drawing
Picture of Gas Meter & Piping

CALL US TODAY FOR A FREE IN-HOME CONSULTATION FOR YOUR PROJECT AT
305-256-0241 AND LET FLORIDA POWER HOUSE DO IT ALL FOR YOU!